{"id":816400,"date":"2023-08-25T13:57:20","date_gmt":"2023-08-25T13:57:20","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=46308"},"modified":"2023-08-25T13:57:20","modified_gmt":"2023-08-25T13:57:20","slug":"avangrid-to-first-pv-project-in-california-with-57-mw-camino-solar","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/avangrid-to-first-pv-project-in-california-with-57-mw-camino-solar\/","title":{"rendered":"Avangrid to first PV project in California with 57 MW Camino Solar"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Avangrid plans to build the 57 MWdc \/ 44 MWac Camino Solar project, its first solar project in California, where the company currently operates more than 500 MW of renewable energy assets through six wind energy facilities. To be constructed by\u00a0Cupertino Electric Inc.\u00a0in Kern County, the project is adjacent to Avangrid\u2019s 189 MW Manzana Wind&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/avangrid-to-first-pv-project-in-california-with-57-mw-camino-solar\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16465,16639,2906,9974,14140],"class_list":["post-816400","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-avangrid-inc","tag-cupertino-electric","tag-news","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/816400","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=816400"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/816400\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=816400"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=816400"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=816400"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}