{"id":817216,"date":"2023-08-29T16:52:52","date_gmt":"2023-08-29T16:52:52","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=46382"},"modified":"2023-08-29T16:52:52","modified_gmt":"2023-08-29T16:52:52","slug":"enphase-now-shipping-iq-microinverters-from-third-u-s-factory","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/enphase-now-shipping-iq-microinverters-from-third-u-s-factory\/","title":{"rendered":"Enphase now shipping IQ microinverters from third U.S. factory"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Enphase Energy has been quickly ramping up a U.S.-based contract manufacturing footprint this year. The rollout started in July, from a facility in Columbia, S.C., with a splashy press conference that included President Biden. Those microinverters are being produced by global manufacturer\u00a0Flex. Next came a Foxconn facility in\u00a0Mount Pleasant,\u00a0Wisc. Today, Enphase is officially shipping IQ&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/enphase-now-shipping-iq-microinverters-from-third-u-s-factory\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16286,12898,15367,12874,2906,3000,13095],"class_list":["post-817216","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-domestic","tag-enphase-energy","tag-inverters-and-ebos","tag-microinverters","tag-news","tag-products","tag-residential-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/817216","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=817216"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/817216\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=817216"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=817216"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=817216"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}