{"id":818447,"date":"2023-09-05T17:54:48","date_gmt":"2023-09-05T17:54:48","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=46483"},"modified":"2023-09-05T17:54:48","modified_gmt":"2023-09-05T17:54:48","slug":"connecticut-retirement-community-leads-charge-for-732-kw-solar-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/connecticut-retirement-community-leads-charge-for-732-kw-solar-system\/","title":{"rendered":"Connecticut retirement community leads charge for 732 kW solar system"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Meadow Ridge retirement community in Redding, Connecticut, has signed an agreement with Verogy to build a 732 kW solar installation. When complete, the project will supply Meadow Ridge with more than 850,000 kWh \u2014 or nearly 20%\u2014of its annual electricity, for an estimated savings of $7.3 million in electricity costs over the life of&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/connecticut-retirement-community-gets-732-kw-solar-system\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15507,2906,9974,2846,16646],"class_list":["post-818447","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial-and-industrial","tag-news","tag-projects","tag-sustainability","tag-verogy"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/818447","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=818447"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/818447\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=818447"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=818447"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=818447"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}