{"id":822007,"date":"2023-09-25T15:42:37","date_gmt":"2023-09-25T15:42:37","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=46781"},"modified":"2023-09-25T15:42:37","modified_gmt":"2023-09-25T15:42:37","slug":"210mm-solar-modules-could-be-70-percent-of-total-capacity-by-2024","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/210mm-solar-modules-could-be-70-percent-of-total-capacity-by-2024\/","title":{"rendered":"210mm solar modules could be 70 percent of total capacity by 2024"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>New data from market intelligence group TrendForce shows the solar module market is trending toward 210mm wafers. By the end of the year the production capacity of 210mm modules is forecast to reach 722GW, or 69.83% of total capacity, TrendForce said. The increase in capacity and shipments demonstrates that large-format, high-power modules are rapidly advancing&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/210mm-solar-modules-could-be-70-percent-of-total-capacity-by-2024\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,5863,1635],"class_list":["post-822007","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-pv-modules","tag-trina-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/822007","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=822007"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/822007\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=822007"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=822007"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=822007"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}