{"id":823575,"date":"2023-10-03T17:32:19","date_gmt":"2023-10-03T17:32:19","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=46964"},"modified":"2023-10-03T17:32:19","modified_gmt":"2023-10-03T17:32:19","slug":"renewable-america-project-boosts-solar-portfolio-for-marin-county-calif","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/renewable-america-project-boosts-solar-portfolio-for-marin-county-calif\/","title":{"rendered":"Renewable America project boosts solar portfolio for Marin County, Calif."},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Renewable America (RNA) has achieved mechanical completion for its Fallon Two Rock Road Solar Farm in the Petaluma area of Marin County, California. The Fallon project will produce an estimated 2,300 MWh\/year as part of the Marin Clean Energy (MCE) portfolio. The Fallon project uses fixed tilt and bifacial modules with 1.45 MWdc capacity, and&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/renewable-america-project-boosts-solar-portfolio-for-marin-county-calif\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15330,811,2906,9974,16520,2846],"class_list":["post-823575","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-cca","tag-community-solar","tag-news","tag-projects","tag-renewable-america","tag-sustainability"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/823575","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=823575"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/823575\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=823575"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=823575"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=823575"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}