{"id":823581,"date":"2023-10-03T19:06:10","date_gmt":"2023-10-03T19:06:10","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=46975"},"modified":"2023-10-03T19:06:10","modified_gmt":"2023-10-03T19:06:10","slug":"redflow-awarded-doe-funding-for-34-4-mwh-energy-storage-project","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/redflow-awarded-doe-funding-for-34-4-mwh-energy-storage-project\/","title":{"rendered":"Redflow awarded DOE funding for 34.4 MWh energy storage project"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Global clean energy storage provider Redflow Limited\u00a0has received U.S. Department of Energy\u00a0funding for a 34.4 MWh long-duration energy storage (LDES) microgrid project in Madera, California. Redflow was named as the battery provider for the project, which will form part of the DOE\u2019s $325 million LDES program to advance critical clean energy technologies, expand the adoption&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/redflow-awarded-doe-funding-for-34-4-mwh-energy-storage-project\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[211,442,1590,16655,697,9974,16507,6457],"class_list":["post-823581","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-department-of-energy","tag-energy-storage","tag-financing","tag-long-duration-energy-storage-ldes","tag-microgrid","tag-projects","tag-redflow","tag-storage"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/823581","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=823581"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/823581\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=823581"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=823581"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=823581"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}