{"id":827459,"date":"2023-10-25T12:31:38","date_gmt":"2023-10-25T12:31:38","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=47237"},"modified":"2023-10-25T12:31:38","modified_gmt":"2023-10-25T12:31:38","slug":"construction-begins-on-200-mw-san-juan-solar-storage-project-in-n-m","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/construction-begins-on-200-mw-san-juan-solar-storage-project-in-n-m\/","title":{"rendered":"Construction begins on 200 MW San Juan solar + storage project in N.M."},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>D.E. Shaw Renewable Investments (DESRI),\u00a0in partnership with Public Service Company of New Mexico (PNM) and SOLV Energy,\u00a0recently celebrated the groundbreaking of the San Juan 1 project. The project is a 200 MWac solar and 400 MWh storage facility located in Farmington, New Mexico. \u201cIn the face of numerous headwinds facing the industry over the last&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/construction-begins-on-san-juan-solar-storage-project\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15608,9974,16680,16366,6457,2846,14140],"class_list":["post-827459","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-d-e-shaw-renewable-investments","tag-projects","tag-public-service-company-of-new-mexico","tag-solv-energy","tag-storage","tag-sustainability","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/827459","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=827459"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/827459\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=827459"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=827459"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=827459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}