{"id":835022,"date":"2023-12-06T17:59:18","date_gmt":"2023-12-06T17:59:18","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=47686"},"modified":"2023-12-06T17:59:18","modified_gmt":"2023-12-06T17:59:18","slug":"depcom-builds-puerto-ricos-largest-solar-energy-storage-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/depcom-builds-puerto-ricos-largest-solar-energy-storage-system\/","title":{"rendered":"DEPCOM builds Puerto Rico\u2019s largest solar, energy storage system"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>DEPCOM Power has inaugurated Ciro One, Puerto Rico\u2019s largest solar and battery energy storage system (BESS). As an integrated provider engineering, procurement and construction (EPC) and operations and maintenance (O&amp;M) services for the utility-scale solar and energy storage markets, DEPCOM conceptualized, procured and managed the installation of the 90 MWac photovoltaic (PV) and 51.5 MW&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/depcom-builds-puerto-ricos-largest-solar-energy-storage-system\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15638,15300,2906,9974,14716,14878,6457,14140],"class_list":["post-835022","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-bess","tag-depcom-power","tag-news","tag-projects","tag-puerto-rico","tag-solar-storage","tag-storage","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/835022","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=835022"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/835022\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=835022"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=835022"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=835022"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}