{"id":835060,"date":"2023-12-07T18:58:19","date_gmt":"2023-12-07T18:58:19","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=47709"},"modified":"2023-12-07T18:58:19","modified_gmt":"2023-12-07T18:58:19","slug":"san-diegos-frontwave-arena-taps-baker-electric-to-provide-797-kw-rooftop-solar-system","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/san-diegos-frontwave-arena-taps-baker-electric-to-provide-797-kw-rooftop-solar-system\/","title":{"rendered":"San Diego\u2019s Frontwave Arena taps Baker Electric to provide 797 kW rooftop solar system"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>San Diego\u2019s newest sports and entertainment arena has inked a local partnership with Baker Electric to provide renewable energy. Baker will install a 1,350-panel rooftop solar array and large-scale battery energy storage system (BESS) for the 7,500 capacity multi-purpose Frontwave Arena in North San Diego County. The 797.09 kWdc solar system is anticipated to contribute&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/san-diego-frontwave-arena-baker-electric-rooftop-solar-system\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13800,15507,16296,2906,9974,565,2846],"class_list":["post-835060","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-baker-electric","tag-commercial-and-industrial","tag-dsd-renewables","tag-news","tag-projects","tag-rooftop-solar","tag-sustainability"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/835060","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=835060"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/835060\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=835060"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=835060"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=835060"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}