{"id":835282,"date":"2023-12-11T16:05:10","date_gmt":"2023-12-11T16:05:10","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=47716"},"modified":"2023-12-11T16:05:10","modified_gmt":"2023-12-11T16:05:10","slug":"cps-adds-25a-fuses-to-1500-v-solar-inverters","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/cps-adds-25a-fuses-to-1500-v-solar-inverters\/","title":{"rendered":"CPS adds 25A fuses to 1500 V solar inverters"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>As the solar PV industry moves toward larger module power generation capacities and short circuit current ratings, many large PV system DC circuits now require 25A rated fuses. To meet this need, CPS America is now producing its 100\/125kW inverter standard\/distributed wire-boxes and 250\/275kW V2 inverters with 25A fuses installed. This product improvement\/change is now&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/cps-adds-25a-fuses-to-1500-v-solar-inverters\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[14380,15367,2906,3000,14140],"class_list":["post-835282","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-cps-america","tag-inverters-and-ebos","tag-news","tag-products","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/835282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=835282"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/835282\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=835282"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=835282"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=835282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}