{"id":835438,"date":"2023-12-14T16:28:09","date_gmt":"2023-12-14T16:28:09","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=47783"},"modified":"2023-12-14T16:28:09","modified_gmt":"2023-12-14T16:28:09","slug":"alliant-energy-completes-99-mw-wautoma-solar-project-in-wisconsin","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/alliant-energy-completes-99-mw-wautoma-solar-project-in-wisconsin\/","title":{"rendered":"Alliant Energy completes 99 MW Wautoma Solar project in Wisconsin"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Alliant Energy has wrapped up construction of the Wautoma Solar project in Waushara County, Wisconsin. The 99 MW solar array spans 624 acres in Dakota and Wautoma, and consists of nearly 240,000 solar panels. The generating facility can produce enough energy to power approximately 26,000 homes annually. \u201cThe completion of this project is a major&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/alliant-energy-completes-99-mw-wautoma-solar-project-in-wisconsin\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666,380],"tags":[13606,12945,2906,9974,2846,14140],"class_list":["post-835438","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","category-wisconsin","tag-alliant-energy","tag-ground-mount","tag-news","tag-projects","tag-sustainability","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/835438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=835438"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/835438\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=835438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=835438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=835438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}