{"id":836703,"date":"2024-01-11T14:00:00","date_gmt":"2024-01-11T14:00:00","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=47994"},"modified":"2024-01-11T14:00:00","modified_gmt":"2024-01-11T14:00:00","slug":"trina-solar-president-explains-their-path-forward-in-u-s-solar-market","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/trina-solar-president-explains-their-path-forward-in-u-s-solar-market\/","title":{"rendered":"Trina Solar president explains their path forward in U.S. solar market"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>2024 is a big year for Trina Solar in the United States. The shining example is the new 1.35 million sq ft solar PV manufacturing facility in Wilmer, Texas, expected to be completed later in the year. The company is investing more than $200 million in property and equipment, and it will produce higher power&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/products\/trina-solar-president-explains-their-path-forward-in-u-s-solar-market\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[4737,2906,3000,5863,13050,1635,14140],"class_list":["post-836703","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-featured","tag-news","tag-products","tag-pv-modules","tag-solar-trackers","tag-trina-solar","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/836703","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=836703"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/836703\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=836703"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=836703"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=836703"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}