{"id":836727,"date":"2024-01-12T14:13:54","date_gmt":"2024-01-12T14:13:54","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=48010"},"modified":"2024-01-12T14:13:54","modified_gmt":"2024-01-12T14:13:54","slug":"intersect-power-switches-on-828-mwp-lumina-solar-project-in-texas","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/intersect-power-switches-on-828-mwp-lumina-solar-project-in-texas\/","title":{"rendered":"Intersect Power switches on 828 MWp Lumina solar project in Texas"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Intersect Power LLC placed its 828 MWp\/640 MWac Lumina Solar project in Scurry County, Texas, into commercial operation on Jan. 3. Built with First Solar panels, the project created more than 900 jobs at peak construction, all of which adhered to a commitment to fair equitable compensation, providing prevailing wages throughout the entire development cycle&#8230;. <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/intersect-power-switches-on-828-mwp-lumina-solar-project-in-texas\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666,81],"tags":[15233,2906,9974,2846,14140],"class_list":["post-836727","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","category-texas-leed-projects","tag-intersect-power","tag-news","tag-projects","tag-sustainability","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/836727","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=836727"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/836727\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=836727"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=836727"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=836727"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}