{"id":840988,"date":"2024-03-21T15:51:28","date_gmt":"2024-03-21T15:51:28","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=48854"},"modified":"2024-03-21T15:51:28","modified_gmt":"2024-03-21T15:51:28","slug":"ferc-affirms-decision-to-hold-utilities-accountable-for-interconnection-delays","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ferc-affirms-decision-to-hold-utilities-accountable-for-interconnection-delays\/","title":{"rendered":"FERC affirms decision to hold utilities accountable for interconnection delays"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Federal Energy Regulatory Commission affirmed its historic July 2023 rule that modernizes the U.S. transmission grid by streamlining the generator interconnection process. The rule, known as Order No. 2023, ensures that resources can connect to the transmission system in a reliable, efficient, transparent and timely manner. This interconnection rulemaking is the first step in&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/policy\/ferc-affirms-decision-on-interconnection-delays\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[12902,15215,2906,4366,9974,14140],"class_list":["post-840988","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ferc","tag-interconnection","tag-news","tag-policy","tag-projects","tag-utility-scale"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/840988","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=840988"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/840988\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=840988"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=840988"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=840988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}