{"id":841341,"date":"2024-03-27T15:46:34","date_gmt":"2024-03-27T15:46:34","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=48913"},"modified":"2024-03-27T15:46:34","modified_gmt":"2024-03-27T15:46:34","slug":"edp-renewables-inks-15-year-ppa-with-walmart-in-texas","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/edp-renewables-inks-15-year-ppa-with-walmart-in-texas\/","title":{"rendered":"EDP Renewables inks 15-year PPA with Walmart in Texas"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>EDP Renewables North America LLC (EDPR NA) and\u00a0Walmart Inc.\u00a0have signed a 15-year power purchase agreement (PPA) for a portion of a new 180 MWac solar project in Texas. The agreement adds to a long-standing national partnership that includes 431 MW of offtake from both utility-scale and distributed generation sites across North America. Under the new&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/edp-renewables-inks-15-year-ppa-with-walmart-in-texas\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15507,13668,13345,2906,13429,9974,2846,14140,1764],"class_list":["post-841341","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-commercial-and-industrial","tag-distributed-generation","tag-edp-renewables","tag-news","tag-ppa","tag-projects","tag-sustainability","tag-utility-scale","tag-walmart"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/841341","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=841341"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/841341\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=841341"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=841341"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=841341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}