{"id":842664,"date":"2024-04-15T18:44:20","date_gmt":"2024-04-15T18:44:20","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=49066"},"modified":"2024-04-15T18:44:20","modified_gmt":"2024-04-15T18:44:20","slug":"solvari-nets-calseed-grant-for-automated-solar-module-assembly-process","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solvari-nets-calseed-grant-for-automated-solar-module-assembly-process\/","title":{"rendered":"Solvari nets CalSEED grant for automated solar module assembly process"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Solvari SR is an all-in-one solar panel that ships with everything needed to install on asphalt shingle roofs: racking, flashing, deck screws, inverter, cabling, and cable management are all included. According to the company, installation time is 2 minutes per module, including lift-to-the-roof. It is a compelling pitch \u2014 at least the California Energy Commission&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/news\/solvari-nets-calseed-grant-for-automated-solar-module-assembly-process\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[15164,2906,4366,3000,5863,13095,16742,13601],"class_list":["post-842664","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-ebos","tag-news","tag-policy","tag-products","tag-pv-modules","tag-residential-solar","tag-solvari","tag-wire-management"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/842664","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=842664"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/842664\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=842664"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=842664"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=842664"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}