{"id":844009,"date":"2024-05-07T14:18:51","date_gmt":"2024-05-07T14:18:51","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=49518"},"modified":"2024-05-07T14:18:51","modified_gmt":"2024-05-07T14:18:51","slug":"case-study-how-rosendin-improved-cable-management-at-utility-scale-sites-with-awm","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/case-study-how-rosendin-improved-cable-management-at-utility-scale-sites-with-awm\/","title":{"rendered":"Case Study: How Rosendin improved cable management at utility-scale sites with AWM"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>In August of 2020, Affordable Wire Management (AWM) was introduced to Rosendin. Thanks to AWM\u2019s ability to design and produce high quality and robust cable management systems (CMS), Rosendin was an early adopter of AWM\u2019s first generation offerings, and became one of AWM\u2019s first partners in the industry. During the course of several years, the&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/advertorial1\/case-study-how-rosendin-improved-cable-management-at-utility-scale-sites-with-awm\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[16500,15164,3000,9974,16280],"class_list":["post-844009","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-affordable-wire-management","tag-ebos","tag-products","tag-projects","tag-sponsored-content"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/844009","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=844009"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/844009\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=844009"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=844009"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=844009"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}