{"id":844478,"date":"2024-05-14T16:27:26","date_gmt":"2024-05-14T16:27:26","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=49585"},"modified":"2024-05-14T16:27:26","modified_gmt":"2024-05-14T16:27:26","slug":"silicon-ranch-to-develop-first-utility-scale-solar-project-under-expanded-tva-program","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/silicon-ranch-to-develop-first-utility-scale-solar-project-under-expanded-tva-program\/","title":{"rendered":"Silicon Ranch to develop first utility-scale solar project under expanded TVA program"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Nashville-based Silicon Ranch has signed an agreement to develop a 110 MW solar project for Middle Tennessee Electric (MTE), the largest electric cooperative in the Tennessee Valley Authority (TVA) region and the second largest in the United States. The Copeland Solar Farm will be the\u00a0first utility-scale solar project under\u00a0TVA\u2019s Expanded Generation Flexibility Program, which allows&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/silicon-ranch-develop-110-mw-solar-project-expanded-tva-program\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[9974,2846,1962],"class_list":["post-844478","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-projects","tag-sustainability","tag-utility-scale-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/844478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=844478"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/844478\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=844478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=844478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=844478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}