{"id":844924,"date":"2024-05-22T19:04:05","date_gmt":"2024-05-22T19:04:05","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=49463"},"modified":"2024-05-22T19:04:05","modified_gmt":"2024-05-22T19:04:05","slug":"the-perils-and-promise-of-1500-volt-solar-systems","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/the-perils-and-promise-of-1500-volt-solar-systems\/","title":{"rendered":"The perils and promise of 1500 volt solar systems"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Contributed by: Will White, Solar Application Specialist at Fluke | 1500 volt solar PV systems were unheard of when I entered the solar industry almost two decades ago. Since then, system components have steadily increased in power and efficiency; the similar size module that could have only generated 175 Watts 20 years ago can often&#8230; <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/featured\/the-perils-and-promise-of-1500-volt-solar-systems\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[13841,15164,4737,15359,3078,1962],"class_list":["post-844924","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-1500-volt","tag-ebos","tag-featured","tag-fluke","tag-om","tag-utility-scale-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/844924","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=844924"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/844924\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=844924"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=844924"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=844924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}