{"id":844966,"date":"2024-05-23T18:17:08","date_gmt":"2024-05-23T18:17:08","guid":{"rendered":"https:\/\/solarbuildermag.com\/?p=49719"},"modified":"2024-05-23T18:17:08","modified_gmt":"2024-05-23T18:17:08","slug":"solar-to-save-groton-public-schools-in-connecticut-40000-in-energy-costs","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/solar-to-save-groton-public-schools-in-connecticut-40000-in-energy-costs\/","title":{"rendered":"Solar to save Groton Public Schools in Connecticut $40,000 in energy costs"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>The Groton Board of Education in Connecticut expects to save $40,000 per year on energy costs after installing solar photovoltaic (PV) systems on two schools in the town. The system at Groton Middle School has 560 panels with a 230 kW capacity, and the Mystic River Magnet School has 256 panels with 100 kW capacity&#8230;. <a class=\"view-article\" href=\"https:\/\/solarbuildermag.com\/projects\/solar-save-groton-schools-connecticut-energy-costs\/\">View Article<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906,9974,2846],"class_list":["post-844966","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news","tag-projects","tag-sustainability"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/844966","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=844966"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/844966\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=844966"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=844966"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=844966"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}