{"id":85348,"date":"2015-01-28T20:55:35","date_gmt":"2015-01-28T20:55:35","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8705"},"modified":"2015-01-28T20:55:35","modified_gmt":"2015-01-28T20:55:35","slug":"ground-mount-honorable-mentions","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/ground-mount-honorable-mentions\/","title":{"rendered":"Ground-Mount Honorable Mentions"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Ground-Mount Honorable Mentions Plymouth Public Schools Plympton, Massachusetts | 5.7 MW Developer\/Contractor: Borrego Solar Modules: Yingli Solar Inverters: SMA America Mounting: SunLink Originally, the project plan consisted of eight to 10 smaller solar arrays across Plymouth Public Schools&rsquo; facilities, but old roof structures and harsh winters prevented rooftop installation. Instead,<a href=\"http:\/\/solarbuildermag.com\/featured\/ground-mount-honorable-mentions\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[4737,12945,12954,12955],"class_list":["post-85348","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-featured","tag-ground-mount","tag-project-of-the-year","tag-treasure-valley-solar"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/85348","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=85348"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/85348\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=85348"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=85348"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=85348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}