{"id":95872,"date":"2015-03-02T21:08:50","date_gmt":"2015-03-02T21:08:50","guid":{"rendered":"http:\/\/solarbuildermag.com\/?p=8905"},"modified":"2015-03-02T21:08:50","modified_gmt":"2015-03-02T21:08:50","slug":"array-technologies-secures-supply-agreement-for-104-mw-dc-utah-red-hills-renewable-park","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/array-technologies-secures-supply-agreement-for-104-mw-dc-utah-red-hills-renewable-park\/","title":{"rendered":"Array Technologies Secures Supply Agreement for 104 MW (dc) Utah Red Hills Renewable Park"},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Scatec Solar Contracts Array Technologies and Swinerton Renewable Energy to Build Utah&rsquo;s largest solar plant Nationally recognized engineering, procurement and construction (EPC) firm Swinerton Renewable Energy has contracted with Albuquerque-based Array Technologies, Inc. (ATI) to procure 104 MW of its DuraTrack&trade; HZ single-axis tracking system for the 630-acre Utah Red<a href=\"http:\/\/solarbuildermag.com\/news\/array-technologies-secures-supply-agreement-104-mw-dc-utah-red-hills-renewable-park\/\">Read More<\/a><\/p>\n<p>&#8212; Solar Builder magazine<\/p>\n","protected":false},"author":174,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[57,9666],"tags":[2906],"class_list":["post-95872","post","type-post","status-publish","format-standard","hentry","category-leed-news","category-solar-power-energy","tag-news"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/95872","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/174"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=95872"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/95872\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=95872"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=95872"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=95872"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}