{"id":98817,"date":"2015-03-12T12:31:06","date_gmt":"2015-03-12T12:31:06","guid":{"rendered":"http:\/\/leedpoints.com\/?guid=627abe9941c3ffb404077cb67b7117eb"},"modified":"2015-03-12T12:31:06","modified_gmt":"2015-03-12T12:31:06","slug":"uninterruptible-power-systems-are-scalable-from-5-20-kva","status":"publish","type":"post","link":"https:\/\/leedpoints.com\/green-building-blog\/uninterruptible-power-systems-are-scalable-from-5-20-kva\/","title":{"rendered":"Uninterruptible Power Systems  are scalable from 5-20 kVA."},"content":{"rendered":null,"protected":false},"excerpt":{"rendered":"<p>Featuring modular design, S5KC Industrial Series adapts to demanding requirements for industrial equipment protection. All components, including 5 kVA power modules, LCD display, battery modules, system control modules, and optional charger module, can be hot-swapped so critical load remains protected during upgrade and always on-line. Additional features include fault-tolerant system, self-diagnostic capabilities, 0.9 power factor, and integrated communications. <\/p>\n<p><b>This story is related to the following:<\/b><br \/><a href=\"http:\/\/news.thomasnet.com\/newsxml\/news\/electrical-equipment-systems\" target=\"_blank\">Electrical Equipment and Systems<\/a><br \/><a href=\"http:\/\/news.thomasnet.com\/newsxml\/news\/green-clean\" target=\"_blank\">Green &amp; Clean<\/a><\/p>\n<p>Search for suppliers of: <a href=\"http:\/\/www.thomasnet.com\/products\/uninterruptible-power-supplies-ups-62680905-1.html\" target=\"_blank\">Uninterruptible Power Supplies (UPS)<\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4350],"tags":[],"class_list":["post-98817","post","type-post","status-publish","format-standard","hentry","category-green-clean"],"_links":{"self":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/98817","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/comments?post=98817"}],"version-history":[{"count":0,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/posts\/98817\/revisions"}],"wp:attachment":[{"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/media?parent=98817"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/categories?post=98817"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leedpoints.com\/green-building-blog\/wp-json\/wp\/v2\/tags?post=98817"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}