Tag: Apparent
-
Load Profiles: How different storage systems, microgrid controllers fit specific C&I sites
This section originally appeared in the Summer 2020 issue of Solar Builder. Subscribe today (print or digital) for free right here. Church Load profile: This church in Bakersfield, Calif., is actually multiple facilities. It has two sanctuaries, a gymnasium, offices and classrooms. While certain small areas are occupied intermittently duringRead More — Solar Builder magazine
-
BYD teams with Apparent to design a 2-MW solar + storage system on its manufacturing plant
Construction has begun on a 2 MW solar and 2 MWh energy storage project developed by BYD (Build Your Dreams) and Apparent, Inc. at BYD’s Lancaster Coach & Bus manufacturing plant. With this installation in place, the project will serve as a way to cut operational costs and offer aRead More — Solar Builder magazine
-
BYD teams with Apparent to design a 2-MW solar + storage system on its manufacturing plant
Construction has begun on a 2 MW solar and 2 MWh energy storage project developed by BYD (Build Your Dreams) and Apparent, Inc. at BYD’s Lancaster Coach & Bus manufacturing plant. With this installation in place, the project will serve as a way to cut operational costs and offer aRead More — Solar Builder magazine