Tag: Fort Green Power Plant

  • Duke Energy Florida announces two additional solar sites (both nearly 75-MW)

    Duke Energy Florida (DEF) has announced the locations of its two newest solar power plants: The Fort Green Power Plant will be built on approximately 500 acres in Hardee County, Fla. The 74.9-megawatt  plant will consist of approximately 265,000 solar panels, utilizing a fixed-tilt racking system that will produce enough carbon-free energyRead More — Solar Builder magazine