Tag: GameChange Racking
-
GameChange mounting 25-MW of systems in landfills across three states
GameChange Racking will be shipping 25-MW of its Pour-in-Place Ballasted Ground Systems for installation on landfill sites in Maryland, Connecticut and New Jersey over the next two months. “Our Pour-in-Place Ballasted Ground System is suitable not only for landfill applications but also for rocky sites which make installing piles challenging,” said Derick Botha,Read More — Solar Builder magazine
-
GameChange releases Gen4 Pour-in-Place Ballasted Ground System
You probably already know about previous versions of the Pour-in-Place. Well, GameChange has announced a newer edition, the Gen4 Pour-in-Place Ballasted Ground System, that will be available for shipping in Q4 2015. The latest innovation features: • Even faster install. • Up to 25% less concrete due to optimized ballast distribution.Read More — Solar Builder magazine
-
GameChange technology handles harsh conditions in 7 MW install
GameChange Racking announced that its articulating purlin technology which is now provided as a standard with its pile-driven and earthscrew ground systems, combined with other GameChange standard flexibility features, handled extreme rolling ground conditions on a 7 MW installation just completed on the East coast. “Being able to meet realRead More — Solar Builder magazine
-
GameChange Pour-in-Place system used 2.5 MW Mass. landfill install
Citizens Energy Chairman Joseph P. Kennedy II, a former Member of Congress, joined with Westfield, Mass., Mayor Daniel Knapik in the ceremonial flipping of a switch in western MA featured in WWLP 22 NEWS. The 2.5 MW Solar Landfill Installation utilized the GameChange Racking Pour-in-Place Ballasted Ground System, and isRead More — Solar Builder magazine