Tag: HellermannTyton
-
Beyond code: The effects of cost cutting in racking, modules on wire management
When we talk about wire management and the code, it is easy to meet the basics of the NEC: neat and orderly, secured every 2 to 4 feet, proper bend radius, among others. But meeting the basics of the NEC tells a completely different story than having and executing aRead More — Solar Builder magazine
-
Beyond code: The effects of cost cutting in racking, modules on wire management
When we talk about wire management and the code, it is easy to meet the basics of the NEC: neat and orderly, secured every 2 to 4 feet, proper bend radius, among others. But meeting the basics of the NEC tells a completely different story than having and executing aRead More — Solar Builder magazine
-
Solar PV eBOS Buyer’s Guide 2020
We asked wire management and electrical component providers to tell us about their latest and greatest products (inverters will be broken out into their own Buyer’s Guide next month). Trends in eBOS components right now include AC combiners, above ground cable management and heavy duty clamps. Check them all outRead More — Solar Builder magazine
-
Solar PV eBOS Buyer’s Guide 2020
We asked wire management and electrical component providers to tell us about their latest and greatest products (inverters will be broken out into their own Buyer’s Guide next month). Trends in eBOS components right now include AC combiners, above ground cable management and heavy duty clamps. Check them all outRead More — Solar Builder magazine
-
Wire you doing that? Top four solar installation wire management issues
1. Cross-mating Cross-mating, which refers to the plugging of connectors from different manufacturers (between modules to optimizers/microinverters, modules to field-connectors, optimizers to field connectors or field connectors to the BOS system) is one of the most common PV wiring mistakes. In fact, the EU-funded Solar Bankability Project’s Failure Modes andRead More — Solar Builder magazine